February 09, 2025 | 15:00 GMT+7

Longest tunnel of North-South expressway expected for completion in December

Tuấn Khang -

The 3,200m-long tunnel is part of the Quang Ngai - Hoai Nhon section of the expressway.

The longest tunnel of the North-South Expressway, which is part of the Quang Ngai – Hoai Nhon section (in the country's central region), is expected for completion this December, according to the investor of the expressway section.

The tunnel is 3,200 m long. The digging of the tunnel is scheduled for completion in April.

Two other tunnels of the Quang Ngai – Hoai Nhon section are projected to complete in June 2025.

The Quang Ngai - Hoai Nhon section has a total length of 88 km, connecting the south-central coastal province of Quang Ngai with the neighboring  Binh Dinh province.

Total investment capital is estimated at over VND20.4 trillion ($864 million).

The expressway section was designed to have four lanes, allowing a maximum speed of 80 kph.

 

Attention
The original article is written and published on VnEconomy in Vietnamese only. To read the full article, please use the Google Translate tool below to translate the content into your preferred language.
VnEconomy is not responsible for the translation.

Google translate