January 28, 2023 | 13:30 GMT+7

PM orders speeding up of construction of Ring Road No. 4

Project around Hanoi has total investment of over $3.73 billion.

Prime Minister Pham Minh Chinh (second from right) inspects construction on January 27. Photo: VGP
Prime Minister Pham Minh Chinh (second from right) inspects construction on January 27. Photo: VGP

Prime Minister Pham Minh Chinh has asked relevant agencies to speed up construction of Ring Road No. 4 passing through Hanoi capital and Hung Yen and Bac Ninh provinces.

He made the call while inspecting construction on January 27.

The road is some 112.8 km in length, with around 58.2 km in Hanoi, nearly 19.3 km in Hung Yen, and some 35.3 km in Bac Ninh.

The project has total investment of over VND85.8 trillion ($3.73 billion), more than VND28.1 trillion ($1.18 billion) of which will come from the State budget and over VND28.19 trillion ($1.22 billion) from local budgets, with the remainder coming from the build-operate-transfer (BOT) venture.

Construction began last year and is slated to be basically completed in 2026 and put into operation in 2027.

It is expected to help ease population density and traffic congestion in Hanoi’s inner city areas and gradually change the local economic structure along the road. The road will also strengthen connectivity and create breakthroughs in the socio-economic development of Hanoi and neighboring areas.

Attention
The original article is written and published on VnEconomy in Vietnamese only. To read the full article, please use the Google Translate tool below to translate the content into your preferred language.
VnEconomy is not responsible for the translation.

Google translate