November 25, 2026 | 08:20

Nhat Le 3 Bridge in Quang Tri technically opens to traffic

Nguyen Thuan

Total investment capital estimated at over VND1.3 trillion ($50 million).

Nhat Le 3 Bridge in Quang Tri technically opens to traffic
Nhat Le 3 Bridge. (Photo: Quang Tri's People's Committee)

Authorities of central Quang Tri province held a technical opening ceremony for Nhat Le 3 Bridge and its approach roads on November 24.

With an investment of more than VND1.3 trillion (approximately $50 million), the project is expected to create a new transport link from National Highway 1A to coastal areas, ease traffic congestion and support urban development along both banks of the Nhat Le River.

This is the third bridge crossing  the Nhat Le River, connecting the eastern side to the coastal road on Bao Ninh Peninsula in Dong Hoi Ward and the western side to National Highway 1A in Quang Ninh Commune.

The entire project stretches more than 2.8 kilometers, including a bridge section of over 561 meters. The permanent structure combines steel and prestressed reinforced concrete, featuring five spans, with the three central spans designed as arch bridges.

The bridge is 23.5 meters wide, providing four traffic lanes and a designed operating speed of 60 kilometers per hour.

Once fully completed and operational, Nhat Le 3 Bridge is expected to ease traffic on existing river crossings, shorten travel times and improve transport and trade connections between surrounding areas.

Attention
The original article is written and published on VnEconomy in Vietnamese, then translated into English by Askonomy – an AI platform developed by Vietnam Economic Times/VnEconomy – and published on En-VnEconomy. To read the full article, please use the Google Translate tool below to translate the content into your preferred language.
However, VnEconomy is not responsible for any translation by the Google Translate.

Google translateGoogle translate