December 04, 2025 | 09:16

Vingroup submits pre-feasibility study for sea-crossing road connecting Can Gio and Ba Ria-Vung Tau

Đan Tiên

The 14-km route requiring total investment at over VND 104.4 trillion ($4.0 billion).

Vingroup submits pre-feasibility study for sea-crossing road connecting Can Gio and Ba Ria-Vung Tau
(Illustrative image).

Vingroup has submitted a pre-feasibility study to Ho Chi Minh City’s People’s Committee for a sea-crossing road and bridge project that will connect the southern city's coastal commune of Can Gio with its Ba Ria-Vung Tau area.

Total investment capital is estimated at over VND104.4 trillion ($4.0 billion).

The proposed route would begin at Bien Dong 2 Road in the Can Gio reclaimed coastal urban area, and end at the planned Mai Sao-Ben Dinh Intersection and 30/4 Street in Tam Thang Ward in the former province of Ba Ria - Vung Tau (now part of Ho Chi Minh City).

It is projected to have a total length of over 14km with six lanes, comprising a 3.1-km tunnel, a 8-km bridge, and a 3-km road.

The group has recommended starting construction in 2026 and completing the project by 2029.

Attention
The original article is written and published on VnEconomy in Vietnamese, then translated into English by Askonomy – an AI platform developed by Vietnam Economic Times/VnEconomy – and published on En-VnEconomy. To read the full article, please use the Google Translate tool below to translate the content into your preferred language.
However, VnEconomy is not responsible for any translation by the Google Translate.

Google translateGoogle translate