January 12, 2023 | 07:04 GMT+7

$426mln elevated ring road in Hanoi opens to traffic

Anh Tú -

Project to help ease traffic jams and give the capital a facelift.

Ring Road No. 2 has a total length of 43.6 km. Photo: VnEconomy
Ring Road No. 2 has a total length of 43.6 km. Photo: VnEconomy

The elevated section of Hanoi’s Ring Road No. 2 from Nga Tu So to Vinh Tuy Bridge and the widened ground stretch from Vinh Tuy to Nga Tu Vong officially opened to traffic on January 11.

The Vinh Tuy - Nga Tu So section, including both the elevated and the ground stretches with a total length of over 8 km, is estimated to have cost nearly VND10 trillion (over $426 million).

With a length of 43.6 km, Ring Road No. 2 forms a traffic ring around Hanoi.

The project, which began in 2018, was built under a build-transfer (BT) contract. Construction was partially interrupted by the Covid-19 pandemic.

It is one of the key traffic works in Hanoi during the 2016-2021 period and is expected to help reduce traffic jams and give the capital a facelift.

Attention
The original article is written and published on VnEconomy in Vietnamese only. To read the full article, please use the Google Translate tool below to translate the content into your preferred language.
VnEconomy is not responsible for the translation.

Google translate